Overview
Design IQ categorizes findings into five severity levels based on the significance and urgency of the issue. This helps you prioritize your review and focus on the most important items first.Severity Levels
Critical
Critical
Urgent issues that represent serious problems requiring immediate attention and resolution.
- Code violations that could prevent approval
- Safety hazards
- Structural inadequacies or failures
- Missing required building systems
- Non-compliance with mandatory regulations
- “Exit door width of 32” does not meet IBC minimum 36” requirement”
- “Structural connection capacity is 15% below required strength”
- “Fire-rated assembly missing required fire-stopping details”
Major
Major
Significant issues that should be addressed but may not be immediately critical.
- Important design inconsistencies
- Calculation errors or omissions
- Conflicts between documents
- Missing important information
- Non-compliance with recommended practices
- “Beam size on structural drawings doesn’t match size in calculations”
- “Energy model shows U-value that exceeds energy code target by 10%”
- “Plumbing fixture count is below recommended minimum for occupancy”
Warning
Warning
Items that warrant review and consideration but may not require changes.
- Potential optimizations
- Best practice suggestions
- Items to review for appropriateness
- Possible improvements
- Areas needing clarification
- “Consider using higher efficiency HVAC equipment to exceed minimum code”
- “Foundation depth may be excessive for given soil conditions”
- “Specify concrete strength verification for critical members”
Pass
Pass
Items that meet requirements and comply with applicable standards.
- Confirmed compliance
- Proper design per standards
- Adequate calculations
- Complete and correct documentation
- Requirements satisfied
- “All exit doors meet IBC minimum 36” width requirement”
- “Structural connection capacity exceeds required strength by 25%”
- “Insulation R-values meet ASHRAE 90.1 requirements for climate zone”
Inconclusive
Inconclusive
Items where the AI could not determine compliance or non-compliance.
- Insufficient information in uploaded documents
- Ambiguous or unclear requirements
- Missing reference documents
- Complex items requiring human judgment
- Information exists but AI couldn’t locate it
- “Could not locate seismic design category in uploaded documents”
- “Insufficient detail in drawings to verify connection bolt spacing”
- “Reference standard for this check was not included in document set”
Severity Distribution
A typical workflow execution might show:- 5-15% Critical - Serious issues requiring action
- 15-30% Major - Important items to address
- 20-40% Warning - Items to review
- 30-50% Pass - Confirmed compliance
- 5-15% Inconclusive - Needs investigation
Visual Indicators
Severity levels use color coding and icons for quick identification:| Severity | Color | Icon | Badge Example |
|---|---|---|---|
| Critical | Red | Octagon-X | 🔴 CRITICAL |
| Major | Orange/Amber | Triangle-Exclamation | 🟠 MAJOR |
| Warning | Blue | Circle-Exclamation | 🔵 WARNING |
| Pass | Green | Circle-Check | 🟢 PASS |
| Inconclusive | Gray | Circle-Minus | ⚪ INCONCLUSIVE |
Filtering by Severity
Use severity filters to focus your review:Severity in Exported Reports
Excel exports include severity levels:- Severity column for sorting and filtering
- Color-coded cells matching the dashboard
- Count of findings by severity
- Summary statistics
Understanding Severity Context
Project Phase
Severity interpretation may vary by project phase:- Schematic Design - Warnings more acceptable
- Construction Documents - Criticals must be resolved
Workflow Purpose
Different workflows may emphasize different severities:- Code Compliance - Focus on Critical/Major
- Optimization - Focus on Warning
- QA Check - All severities important
Best Practices
Prioritize Critical Items - Always address Critical findings first.
Don’t Ignore Warnings - Review Warning items; they often lead to better designs.
Investigate Inconclusive - These may indicate missing information or documentation gaps.
Document Pass Items - Confirmed compliance is valuable for reviews and approvals.